Skip to main content
Indian Furniture, Modular & Solid-Wood Manufacturers

Omeecron Furniture Manufacturing ERP

Cloud ERP for Indian furniture manufacturers — Jodhpur solid-wood exporters, Mumbai modular factories, Bengaluru office furniture, Pepperfry / Urban Ladder vendors. Modular + solid-wood dual costing, custom-size BOM auto-expansion, finish recipe master, project milestone billing, breakage photo trail, BIS + BIFMA compliance. From ₹1,700/month.

2
Costing Models
Auto
Custom-Size BOM
BIFMA
X5 Compliant
100%
Cloud-Only
Photo: Bailey Alexander · Unsplash
Problems We Solve

Where the day-to-day really hurts

Real pain we’ve seen on Indian factory floors — and how the system fixes each one.

Your factory makes modular wardrobes AND solid-wood dining tables. Tally treats them the same way; you cost both wrong; one product subsidises the other invisibly.

Dual costing engine: modular = BOM-driven, solid-wood = timber × cubic-foot × wastage. Each costed correctly side-by-side.

Customer wants the 1500mm wardrobe but in 1800mm width. Engineering team rebuilds the BOM by hand. 2 hours per custom variant. Salesperson loses the deal during the wait.

Custom-size BOM auto-expansion. Length / width / height scaling factors per design auto-adjust material consumption. Quote ready in 2 minutes, not 2 hours.

Project order: 50 wardrobes for a hotel. Customer wants invoice in milestones — 30% on PO, 60% on dispatch, 10% on installation. Your accountant invoices in one shot. Cash flow ruined.

Milestone billing engine: each milestone auto-generates GST invoice + EWB with customer-side acceptance gate. Cash flow matches contract.

Furniture arrives broken at customer site. Customer says "your delivery"; transporter says "your packing". You eat the loss — ₹40,000 for one wardrobe.

Carton-level photo log at dispatch + delivery. Insurance pays, customer pays, or transporter pays — based on photo evidence.

Pepperfry settlement report drops 21 days later as a 4000-row CSV. Returns + storage fees + commission deductions all mixed together. Your accountant accepts whatever lands.

Auto-reconciliation against Pepperfry / Urban Ladder / Wakefit / Amazon settlement CSVs. Per-SKU, per-order match against marketplace fees. Typical recovery: 1-3% of marketplace revenue.

BIS IS 1141 timber-preservation cert + BIFMA X5.1 office-chair durability test cert demanded by corporate-project customer. You scramble for old PDFs and pray they match the batch.

BIS + BIFMA cert library linked per design + per batch. Customer audit one-click report.

What You Save in 12 Months

Real ROI, with numbers we can defend

2 hr → 2 min
Custom-Size Quote

Time to quote a custom-size variant — BOM auto-expansion replaces hand-rebuilding.

0
Disputed Breakages

Zero disputed transit-damage claims after carton-level photo trail kicks in.

1-3%
Marketplace Recovery

Recovery from missed Pepperfry / Urban Ladder / Wakefit / Amazon settlement reversals.

100%
On-Time Milestone Invoice

Every project milestone invoiced on the trigger date — not 2 weeks late.

Why Omeecron

Built for this industry, not adapted from generic ERP

Modular + Solid-Wood Dual Costing

Modular BOMs (carcass + door + slides + handles + edge-band) and solid-wood costing (timber grade × cubic foot × wastage %) live side-by-side. Same factory runs both without one ERP forcing the other model.

Custom-Size BOM Auto-Expansion

Customer asks "this design but 1800mm wide instead of 1500mm" → BOM scales material consumption by length / width / height factors. Quote and production plan update in seconds. No re-engineering for every variant.

Finish Recipe Master

Stain + sealer + topcoat recipes defined once (natural walnut, dark teak, rustic oak, etc.). Same SKU + different finish = different BOM + different cost. Auto-applied at order entry.

Breakage Photo Trail

Photo log at dispatch + photo log at delivery for every carton. Furniture breaks in transit; disputes resolved with evidence chain, not arguments. Insurance claims defensible.

Project Milestone Billing

Project orders invoiced in milestones — 30% on PO + 60% on dispatch + 10% on installation sign-off. Each milestone auto-generates its GST invoice + EWB. Customer-side acceptance captured per milestone.

E-Commerce Reconciliation

Pepperfry / Urban Ladder / Wakefit / Amazon / Flipkart settlement reports parsed automatically. Marketplace fees, return-related credits, TDS, TCS reconciled per SKU per order. Recover the 1-3% that's currently slipping.

End-to-End Workflow

How Omeecron Furniture Manufacturing ERP runs your factory

1
Order Entry (Retail / Project)
2
BOM Resolution
3
Material Allocation
4
Cutting / Panel-Saw
5
Pre-Assembly / Edge-Banding
6
Finishing
7
Final QC + BIS / BIFMA Cert
8
Packing + Photo Log
9
Dispatch + GST Invoice
10
Delivery + Customer Photo
11
Installation (Project)
12
Marketplace / Customer Reconcile
What You Get

80+ ready modules, grouped by what you do every day

Design & SKU

  • Design library with CAD reference
  • Modular SKU: carcass + door + drawer + handles BOM
  • Solid-wood SKU: timber × cubic-foot × wastage
  • Finish recipe library (stain / sealer / topcoat)
  • Custom-size BOM expansion rules per design
  • Collection / range tagging

Timber & Raw Materials

  • Timber master by species + grade (teak / sheesham / mango / sal)
  • Plywood / MDF / HDHMR / particleboard inventory
  • Hardware master (slides, hinges, handles, locks)
  • Veneer + laminate inventory
  • Edge-banding + adhesives
  • Lacquer + sealer + polish stock

Production

  • Cutting / panel-saw job cards
  • Edge-banding workflow
  • Pre-assembly + drilling
  • Finishing (sand / stain / sealer / topcoat passes)
  • QC checkpoints per design
  • Knock-down (KD) vs pre-assembled output

Sales — Retail

  • MRP labelling per Legal Metrology
  • Showroom POS
  • Dealer / distributor ledger
  • E-commerce SKU mapping (Pepperfry / UL / Wakefit / Amazon)
  • Marketplace settlement reconciliation
  • Returns + replacement workflow

Sales — Project

  • BOQ-driven quotation
  • Custom-size BOM expansion at quote
  • Milestone billing (30/60/10 splits)
  • Installation team + schedule
  • Site-survey + measurement capture
  • Customer-side acceptance sign-off per milestone

GST + Export + Compliance

  • GST + 1-click E-Way Bill (NIC API)
  • Auto e-Invoice IRN (≥ ₹5 Cr)
  • BIS IS 1141 / IS 1659 / BIFMA records
  • TDS / TCS on marketplace payouts
  • RoDTEP claim prep for exporters
  • FEMA / EDPMS for export receivables

The Dual-Costing Reality

Modular and solid-wood costed correctly, in the same factory.

The single biggest reason generic ERPs fail in Indian furniture: the factory runs both models. Same shop floor produces modular wardrobes (BOM-driven) and solid-wood tables (timber-cost-driven) — and they cost completely differently.

  • Modular SKU: BOM lists every part — 18mm pre-laminated particleboard for carcass, 18mm MDF for door, two drawer slides, four handles, edge-banding, adhesive, screws. Cost = sum of part costs + labour + overhead + margin.
  • Solid-wood SKU: Cost driver is timber. 6-seater dining table consumes ~22 cubic feet of teak. Teak grade A1 at ₹4,200/cubic-foot. Wastage allowance 12%. Plus hardware + finishing + labour + overhead + margin.
  • Same SKU in different finishes: "Walnut" vs "Mahogany" vs "Natural" — same modular BOM, different finish recipe (stain + sealer + topcoat passes). Cost differs by ~₹200-800 per piece. Captured at order entry, not back-of-envelope.
  • Mixed orders: a hotel project order has modular wardrobes + solid-wood headboards in the same PO. The system costs each line correctly without forcing one model on the other.

This is the workflow that lets you quote a project accurately. End of the "we lost ₹2 lakh on that hotel order because the timber went over" reviews.

Honest Cloud Boundaries

What runs in the browser vs what needs an on-site connector.

Starter and Growth plans are 100% cloud — open Chrome, do everything. Hardware integrations can work but need a small on-site connector (quoted separately, Enterprise scope):

  • ✓ Cloud-only (Starter / Growth): Dual costing (modular + solid-wood) · Custom-size BOM expansion · Finish recipe master · Project milestone billing · Breakage photo trail (mobile uploads) · E-commerce reconciliation · GST + EWB · Customer + supplier ledgers · BIS / BIFMA document storage · Marketplace SKU mapping · Retail POS (tablet-based)
  • ⚙ Needs on-site connector (Enterprise add-on): Auto-read cut-list from CNC / panel-saw (Biesse / Homag / SCM controllers via DXF/CSV import) · Direct integration with paint-line dosing systems for finish recipe execution · Live floor-shop scanner ingestion at edge-banding / drilling stations

We don't claim cloud-magic over your CNC. If you want your panel-saw cut-list to flow from the ERP without re-entry, we install a small Windows agent at the cutting station that talks to your machine and pushes the cut-list. Quoted per machine. Manual cut-list export-import works fine on Starter / Growth.

On the roadmap · Rolling out through 2026

AI assists on the roadmap for your furniture factory.

AI assists are rolling out on the Omeecron platform through 2026 — included on the Growth plan when they ship, no extra cost. Here's exactly where AI will help in your factory's daily flow:

  • 📄 Document AI (OCR + auto-fill): Customer drawings → custom-size BOM auto-expanded; Pepperfry / Urban Ladder settlement CSVs → per-SKU reconciliation drafted, ready to post.
  • 👁 Quiet Watchdog (anomaly detection): Marketplace settlement gaps, finish-recipe deviation per shift, and project milestone slippage — flagged before the cash-flow hit.
  • 💬 Ask Your ERP (vertical chatbot): "Margin per SKU last month" · "Open milestones across project orders" — typed answer with the dual-costing math baked in.

These are planned features, not live today. We're building them in the open and Growth-plan customers get them free as they ship. Want early-access? WhatsApp us.

Who is this for?

  • Owner-operators of 30–500-person furniture factories
  • Jodhpur solid-wood exporters serving US / EU buyers
  • Mumbai / Gujarat modular furniture brands
  • Bengaluru office-furniture project specialists serving tech parks
  • Saharanpur traditional carved-wood manufacturers
  • Pepperfry / Urban Ladder / Wakefit / Amazon vendor brands
  • Hotel + hospitality fit-out contractors
  • Manufacturer + own-retail brands (Godrej Interio / Nilkamal model)
Compliance & Standards

Pre-configured for Indian regulatory requirements

BIS IS 1141 (timber preservation) BIS IS 1659 (plywood specification) BIS IS 12049 (modular furniture spec) BIFMA X5.1 (office chair durability) BIFMA X5.5 (desk durability) BIFMA X5.9 (storage furniture) Legal Metrology Act (MRP labelling) GST E-Invoice + EWB + RoDTEP (for exporters)
Feature Comparison

Omeecron vs Wood-Designer / SAP Business One / Tally + Excel

See how we stack up feature by feature.

Built for Indian furniture (modular + wood)

Omeecron Yes
Wood-Designer / SAP Business One / Tally + Excel Generic / global

Dual costing (modular BOM + solid-wood)

Omeecron Both models
Wood-Designer / SAP Business One / Tally + Excel Force one model

Custom-size BOM auto-expansion

Omeecron Per-design factors
Wood-Designer / SAP Business One / Tally + Excel Engineering rebuild

Finish recipe master (stain + sealer + topcoat)

Omeecron Library + cost
Wood-Designer / SAP Business One / Tally + Excel Manual override

Project milestone billing (30/60/10)

Omeecron Built-in
Wood-Designer / SAP Business One / Tally + Excel Manual invoice

Carton-level breakage photo trail

Omeecron Dispatch + delivery
Wood-Designer / SAP Business One / Tally + Excel Not available

E-commerce settlement reconciliation

Omeecron Pepperfry/UL/Wakefit/AMZ
Wood-Designer / SAP Business One / Tally + Excel Manual CSV

BIS IS 1141 + IS 1659 + BIFMA X5 cert library

Omeecron Per-design + batch
Wood-Designer / SAP Business One / Tally + Excel Folder of PDFs

GST + auto e-Invoice + E-Way Bill

Omeecron Native
Wood-Designer / SAP Business One / Tally + Excel Manual portal

Deployment model

Omeecron 100% cloud
Wood-Designer / SAP Business One / Tally + Excel On-prem / heavy
Simple, Transparent Pricing

Pick a Plan That Fits Your Factory

Start small, scale when ready. All plans include free implementation support to get you live.

Starter

₹1,700 /month
  • All core modules included
  • GST + 1-click E-Way Bill (NIC API)
  • Cloud access on web + mobile
  • Email + WhatsApp support
  • * Custom modules charged separately
Start with Starter

Growth

₹3,500 /month
  • Everything in Starter
  • Multi-GSTIN single login
  • Priority WhatsApp + phone support
  • Free quarterly upgrades
  • On-site visits in Gujarat (free)
  • Multi-user role permissions
  • * Custom modules charged separately
Choose Growth

Enterprise

Custom
  • Everything in Growth Annual
  • Multi-company / multi-unit setup
  • Dedicated implementation manager
  • On-site training across India
  • Custom modules included in scope
  • SLA-backed uptime + dedicated support
  • Fixed quote agreed upfront — no T&M
Get a custom quote

Starter

₹16,320 /year
  • All core modules included
  • GST + 1-click E-Way Bill (NIC API)
  • Cloud access on web + mobile
  • 20% off vs monthly (₹20,400 → ₹16,320/yr)
  • Locked-in pricing for 12 months
  • * Custom modules charged separately
Save 20% — pay annually
Most Popular

Growth

₹33,600 /year
  • Everything in Starter Annual
  • Multi-GSTIN single login
  • Priority WhatsApp + phone support
  • Free quarterly upgrades & on-site visits (Gujarat)
  • 20% off vs monthly (₹42,000 → ₹33,600/yr)
  • Free onboarding & data migration
  • Locked-in pricing for 12 months
  • * Custom modules charged separately
WhatsApp for demo

Enterprise

Custom
  • Everything in Growth Annual
  • Multi-company / multi-unit setup
  • Dedicated implementation manager
  • On-site training across India
  • Custom modules included in scope
  • SLA-backed uptime + dedicated support
  • Fixed quote agreed upfront — no T&M
Get a custom quote

* Anything outside the standard module set — bespoke compliance reports, integration with specific machinery or instruments, workflows unique to your factory — is quoted separately on Starter and Growth plans (monthly or annual). Enterprise customers get custom modules included in their fixed scope. Annual plans are priced as monthly × 12 × 0.80 — a flat 20% prepay discount, locked for 12 months. We share a written quote before any custom work begins. No surprises, no time-and-materials billing.

Feature availability by plan

Pricing varies by billing period (see toggle above) — features are identical for monthly and annual on the same plan.

Feature Starter Growth Enterprise
Dual costing (modular + solid-wood)
Custom-size BOM auto-expansion
Finish recipe master
Carton-level breakage photo trail
Retail POS + MRP labelling
GST + auto e-Invoice + E-Way Bill
BIS / BIFMA document storage
Multi-GSTIN single login
Project milestone billing (30/60/10)
Multi-channel (retail / dealer / market / exp)
E-commerce settlement reconciliation
RoDTEP + FEMA / EDPMS for exporters
Priority WhatsApp + phone support
Free quarterly upgrades
CNC / panel-saw on-site connector
Paint-line dosing integration
Multi-unit / multi-company
Dedicated implementation manager
On-site training across India
SLA-backed uptime
FAQ  ·  11 answers

Frequently Asked Questions

Quick answers about Indian Furniture, Modular & Solid-Wood Manufacturers.

Each SKU is tagged at creation as either modular or solid-wood. The system applies the right costing model automatically; both can coexist in the same PO, in the same production schedule.

  • Modular SKU: BOM-driven. Carcass + door + slides + handles + edge-banding + adhesive + screws. Cost rolls up from parts.
  • Solid-wood SKU: Timber-driven. Defines species + grade + cubic-foot consumption + wastage % + hardware + finishing. Cost = (timber CFT × ₹/CFT × (1 + wastage)) + hardware + labour + overhead + margin.
  • Mixed orders: a hotel PO with 30 modular wardrobes + 15 solid-wood beds — both lines costed correctly without manual override
  • Reporting: profitability dashboards split by costing model — see which type of order makes you money

It handles dimensional scaling (length × width × height) per design. For genuinely new variants (a wardrobe with extra shelves, a different drawer layout), Engineering raises a new SKU — but those are rarer than people think.

  • Per-design scaling factors: set how material consumption scales with each dimension
  • Example wardrobe: 1500mm wide standard; scaling factor 0.7 per 100mm width change. Customer wants 1800mm → carcass-board area auto-scales × (1 + 3 × 0.07/100mm); hardware count unchanged.
  • Quote update: 2 minutes, not 2 hours. Salesperson closes during the visit.
  • Production plan: custom-size piece slots into the cutting plan with adjusted dimensions; rest of the workflow unchanged
  • Edge case: if a customer wants 3000mm (twice the standard) the engine warns and routes to Engineering review — large-jump variants need separate validation

Same recipe pattern as F&B but for wood finishes. Each finish (Walnut, Mahogany, Natural, Distressed Teak) is a defined sequence of passes with specific products + quantities + drying time.

  • Recipe: Walnut on teak = 1 coat wood-conditioner + 2 coats walnut stain + 1 coat sanding-sealer + 2 coats PU lacquer. Each pass has a specified consumption (g/sqft) and drying time.
  • Auto-cost: applying Walnut to a piece consumes 120g across all passes × ₹/g of each product = finish cost per piece
  • Same SKU different finish: a dining table in Natural costs ₹400 less than in Walnut. Captured at order entry; not retrofitted in costing later.
  • Finish library: 20-40 finishes typical; one-time setup with your finishing-shop supervisor
  • QC trail: each pass captured per piece for warranty + customer complaint resolution

Project orders define the milestone split (typical 30% PO + 60% dispatch + 10% installation, but configurable per customer). Each milestone trigger auto-generates a GST invoice + EWB + customer-side acceptance gate.

  • PO milestone: 30% invoice raised on PO acceptance; e-Invoice + EWB on advance payment
  • Dispatch milestone: 60% invoice raised on dispatch; per-line dispatch quantity tracked; EWB via NIC API
  • Installation milestone: 10% invoice raised on site-acceptance sign-off; installation team mobile-app captures customer signature + photo
  • Mixed-milestone schedules: hotel project might have phased delivery (50% wave 1 dispatch + 50% wave 2 dispatch + final installation) — each wave tracks independently
  • Retention / withholding: some corporate customers withhold 5-10% for defect-liability period; tracked in the customer ledger

Yes — per-carton photo at dispatch + per-carton photo at delivery, both linked to the consignment. When a customer disputes damage, the evidence is one click away.

  • Dispatch: packing supervisor takes photo per carton at the loading dock
  • Delivery: driver / delivery agent takes photo per carton at customer site via mobile app
  • Customer claim: system shows both photos side-by-side; damage visible only in delivery photo = transit damage (insurance / transporter chargeback); damage visible in dispatch photo = your packing problem
  • E-commerce returns: Pepperfry / UL / Wakefit dispute portals accept the dispatch photo as packing-quality evidence
  • Insurance: transit-insurance claims are defensible in arbitration with the photo trail; recovery typically 60-80% of damage value

Marketplace settlement reports (Pepperfry / Urban Ladder / Wakefit / Amazon / Flipkart / Myntra) are parsed nightly. Sales, returns, fees, TDS, TCS reconciled per SKU per order. Typical recovery: 1-3% of marketplace revenue.

  • SKU mapping: each marketplace SKU mapped to your internal SKU at onboarding
  • CSV / API ingestion: Pepperfry seller-panel exports, UL vendor portal, Wakefit consignment statements, Amazon Settlement Report, Flipkart MIS — all parsed
  • Reconciliation: per order line — gross sale, marketplace commission, return charges, storage / pick-pack, TDS 194-O, TCS 52 — matched against the bank credit
  • Discrepancy report: orders where marketplace owes you but credit didn't land; flagged for follow-up with marketplace finance
  • Common recoveries: closing fee not reversed on cancelled orders, return-related credits delayed, storage fee mis-calculated, TDS short-deducted

Yes — export workflow (shipping bill, AWB, FEMA Form A-2, EDPMS, RoDTEP claim prep) is on Growth and Enterprise plans.

  • Pre-shipment: Form A-2 + shipping-bill prep with HSN-mapped duty drawback / RoDTEP rates
  • EDPMS data uploaded with shipping bill
  • Post-shipment: bank-credit advice ingested; auto-matched against shipping-bill GR/SDF; e-BRC tracked
  • RoDTEP claim auto-prepared per HSN (typical wood-furniture rates 2-4%)
  • Container photo trail matters for export: stuffing photos + survey reports + load-port photos all captured for documentary credit (LC) compliance
  • Forest-products documentation: Forest Department transit pass + species certification linked to dispatch

Yes — compliance cert library linked per design + per batch. Customer audit ("show me the BIFMA test cert for these chairs") resolves in one click.

  • BIS IS 1141 (timber preservation): per-timber-lot treatment cert stored
  • BIS IS 1659 (plywood spec): per-plywood-lot grade cert stored
  • BIFMA X5.1 (office chair durability): per-design test cert uploaded
  • BIFMA X5.5 (desk durability): per-design test cert uploaded
  • BIFMA X5.9 (storage furniture): per-design test cert uploaded
  • Customer audit pack: one-click export of all relevant certs for a given order or design
  • Expiry calendar: certs typically valid 3 years; renewal reminders 90 days before expiry

14–21 working days for a 50-person factory. The variable is the SKU master cleanup — depends on whether your existing Excel BOM library is clean or messy.

  • Day 1–4: SKU + BOM migration (the heavy bit — typically 100-500 SKUs)
  • Day 5–6: Finish recipe library setup with your finishing-shop supervisor
  • Day 7–8: Custom-size scaling-factor setup per design (typical 10-30 designs)
  • Day 9–10: User training (production, finance, sales — online OR on-site)
  • Day 11–12: First parallel order (one retail + one project) validated
  • Day 13–18: Production team training on cutting / edge-banding / finishing workflow
  • Day 19–21: Cutover with reconciled ledgers + first marketplace reconciliation run

Pricing starts at ₹1,700/month for the Starter plan, with a flat 20% discount when you pay annually.

  • Starter — ₹1,700/month or ₹16,320/year: dual costing (modular + solid-wood), custom-size BOM expansion, finish recipe master, single channel, GST + EWB, BIS / BIFMA document storage, retail POS
  • Growth — ₹3,500/month or ₹33,600/year: + multi-GSTIN, project milestone billing, multi-channel sales (retail / dealer / e-commerce / export), e-commerce settlement reconciliation, RoDTEP + FEMA / EDPMS for exporters, priority support
  • Enterprise — Custom quote: + multi-unit, dedicated manager, CNC / panel-saw on-site connector, paint-line dosing integration, SLA-backed uptime

Starter and Growth are 100% cloud — no agents required. CNC / panel-saw / paint-line connectors are Enterprise-tier add-ons, quoted per machine.

Yes — every plan includes ongoing support, free upgrades, and statutory advisory updates (BIS amendments, BIFMA revisions, marketplace fee schedule changes, GST rate changes).

  • All plans: Email + WhatsApp support, Mon–Sat 9 AM – 7 PM IST
  • Growth: + Priority phone support, free quarterly upgrades, free Gujarat on-site visits, BIS / BIFMA / marketplace advisory updates
  • Enterprise: + Dedicated implementation manager, SLA-backed uptime, on-site across India (Jodhpur / Mumbai / Bengaluru / Saharanpur), on-site connector maintenance included
Didn’t find your answer? Ask us directly

Glossary — terms used on this page

Modular vs Solid-Wood
Two fundamentally different furniture-manufacturing models. Modular uses engineered panels (particleboard, MDF, HDHMR, plywood) assembled with hardware; costed by BOM. Solid-wood uses sawn timber; costed by cubic-foot consumption + wastage.
BOM Expansion
The process of taking a base design and scaling its material consumption for a custom size (length × width × height). A 1500mm wardrobe scaled to 1800mm doesn't need re-engineering — the ERP applies per-dimension scaling factors automatically.
Finish Recipe
A defined sequence of stain + sealer + topcoat passes used to achieve a specific finish (Walnut, Mahogany, Natural, Distressed). Same concept as a F&B recipe but for wood surface treatment.
KD vs Pre-Assembled
Knock-Down (KD) = product shipped flat-packed for customer assembly (Pepperfry / Amazon standard). Pre-Assembled = product shipped fully built (project orders, hotels). Different cartoning + breakage profiles.
BIFMA X5
Business and Institutional Furniture Manufacturers Association — US-based certification body whose X5.1 / X5.5 / X5.9 standards define office furniture durability tests. Required by most corporate-project buyers in India.
Milestone Billing
Project-order billing pattern where the contract value is split across pre-defined milestones (typical 30% PO + 60% dispatch + 10% installation). Cash flow aligns with project progress rather than landing in one shot.
 ·  Omeecron Solutions · Surat, Gujarat · v2026
Talk to a Real Person

Get a personalised demo & quote

Reply within 24 hours. We’ll walk through your factory workflow, show the modules that matter for you, and quote any custom modules separately — no obligation.

Trusted certifications & verified achievements

Amazon Ads Official Partner
Google Ads Certified
GeM Portal Registered Vendor
ISO 27001 Security Certified
150+ Projects Successfully Delivered
4.7 / 5 Stars Avg. of 21 client reviews

Serving clients across India & worldwide  ·  Based in Surat, Gujarat  ·  Est. 2018 (8+ years)